time of execution: from December 2020 to February 2021
Nikola Tesla_new airport _ Belgrade, Serbia
· Open Cell Ceilings OS 707 m, base 9, mesh 100x100x40 mm, prepainted aluminium RAL 7024 Graphite Grey.
surface: 13.000 mq
· Metal Mesh Ceilings MSTA00X, 600 x 600 mm, 1,2 mm, open area 64%, powder coated RAL 9006 Silver.
Including suspension system T BAR GRID T15, Click 15 x 38 mm, RAL 9006 Silver.
surface: 3.000 mq
· Cubic Edge Linear Strips ST080AA, ST130AA, ST180AA, prepainted aluminium RAL 1015 Ivory.
Including suspension with main runner T UNI + Linear Joints GL
surface: 12.000 ml